{"id":1070,"date":"2011-08-29T20:35:07","date_gmt":"2011-08-29T18:35:07","guid":{"rendered":"http:\/\/frangipani.se\/?page_id=1070"},"modified":"2011-08-29T20:36:02","modified_gmt":"2011-08-29T18:36:02","slug":"construction","status":"publish","type":"page","link":"https:\/\/frangipani.se\/?page_id=1070","title":{"rendered":"Construction"},"content":{"rendered":"
We flew to Thailand septemnber 2009 where we decided to take the step and jump of the unknown.\u00a0We signed a contract with the developer Narong, lawyer Nirut and our Swedish contact Lennart, he was also being our future neighbor because he and his wife Ann-Marie also built house in the same area.\u00a0With us was another Swedish couple from Stockholm, Niklas and Nettan, who also dared to jump.\u00a0They signed a contract at the same time as us and would thus be our future neighbors.\u00a0We met Micke and Miriam who also was our future neighbors.\u00a0Everyone was very nice and we are so glad for it today.
\nThe house would be finished by the end of July 2010 under the contract. And the last step was taken to our own house in Thailand that we have helped designed.\u00a0How fun is that!<\/p>\n
<\/p>\n
Ground was broken November 21, 2009, then cast the first pillars.\u00a0And then the construction was no moving at\u00a0all until March 2010 when we got down to Koh Tao again.\u00a0Then we were told that they had been waiting to build our house until they had made the roof of our nearest\u00a0neighbor Paul’s house. So they could build our house higher and thus we would get a better seaview.\u00a0The developer had promised that all the houses in the area would have a seaview, so it was a great anticipation.\u00a0But this waiting was absolutely terrible, for we had no information about this during these 4 month.\u00a0Sure, we called and asked what they were doing but they just said ”next week, next week”.<\/p>\n
They promised us that they would start every week, but nothing happened.
\nThai’s are not a people of\u00a0communication, unfortunately.
\nIn March, we also met our real construction engineer, PiOhn that would build our house.\u00a0He had also redesigned some part of the house because the land is quite steep and the stone that we would have in the house was a little bigger than they thought, he could draw out the house so all of a sudden it was 20 m2 larger. Which we are really grateful for today.\u00a0The new drawing was totally amazing. We would in particular have levels on the lower floor and high ceilings, this would be really nice, we saw it in front of us!<\/p>\n
<\/p>\n
Then took the building real momentum until June, when it became quiet on the\u00a0constructing\u00a0front again.\u00a0The house was only half built at this time and we began to realize that it would not be finished at the end of July.\u00a0The blamed than in the one and than the other.\u00a0Both us and Niklas and Nettan had been promised that they would build our house alternately until the two houses would be ready in July.\u00a0Their house was completed almost on time but we were promised that our house would be completed by the end of August, which then became September, October, November.\u00a0Then it was suddenly wet season and no\u00a0construction\u00a0work could be performed because of all the rain.\u00a0Now we started to get really frustrated, we had booked our flight-tickets to Thailand on Christmas Eve and expect to finally get to stay in our newly built house on the paradise island of Koh Tao.\u00a0They promised us that the house would be ready when we arrived on Boxing Day.\u00a0But we were disappointed once again.<\/p>\n
We arrived in Koh Tao, the sun was shining and we took the first best taxi up to our dream house.\u00a0With us we had a whole load of things for the house we had purchased in Samui the day before.\u00a0Cooking utensils, ornaments, table lamps, television, towels, sheets, etc.\u00a0We had lot of things from Norway too, so we were really loaded up the taxi.\u00a0When the taxi comes up to the turnaround and we look up at our house, it feels incredibly nice and funny.\u00a0But when we come up on the terrace, we saw that no windows where installed, not everything was painted, no tiles was put up in the bathroom, it was really a lot to do inside the house.\u00a0We met PiOhn on the first floor terrace and he was truly sorry that the house was not finished.<\/p>\n
And what could we do. <\/a> \u00a0So instead of a three-week wonderfully chill-vacation there was a three-week job-vacation to try to get Narong and PiOhn to complete our house as soon as possible, we had time constraints as well.\u00a0Tomas could only be in Thailand until mid-January and then I Linda, would stay and have visits from my mom and her friend and husband.\u00a0We would like to stay in the house before Tomas went home and then mom would also stay there.\u00a0So we were really stressed and frustrated again. Ok, now you maybe thinks that everything is milk and honey, right? Now when we were there in January we started up our Thai Co. Ltd., Frangipani Villa Koh Tao.\u00a0This is to own the land which our house stands on, which was owned by Lennart and his Thai Co. Ltd. We transferred the land-paper when we where on Koh Tao in Juni this year.\u00a0It has finally becomes ours. We also got the blue book for the house, which is a kind of a address-book for Frangipani Villa.<\/p>\n In retrospect, we learned that the developer Narong has a lot of money problems, he owes money here and there.\u00a0This has obviously affected the construction of our house and all the other houses in the area.\u00a0It has also affected our view of the Thai people, their are not to rely blindly on them, as we where naive at the beginning of our house-building.\u00a0Now, we are pleased that we have a nearly finished house, where only some small things left to fix.\u00a0But there are many fine details that failed to materialize due Narong which he promised to do for us, as we will probably never get to unless we pay again to someone else who can do it! After all, we have an incredibly nice endresult, but that needs a little fine-tuning. We hope our thoughts and experience can help others.\u00a0If you have questions, please do not hesitate to contact us.<\/p>\n And we long so much to get a ”cold” on our lovely terrace!<\/p>\n <\/a><\/p>\n","protected":false},"excerpt":{"rendered":" Our dreamhome Frangipani Villa on Koh Tao in Thailand On this page we will try to tell you what it is to build houses in Thailand. One thing that we Continue Reading \u2192<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":1037,"menu_order":2,"comment_status":"open","ping_status":"open","template":"","meta":[],"_links":{"self":[{"href":"https:\/\/frangipani.se\/index.php?rest_route=\/wp\/v2\/pages\/1070"}],"collection":[{"href":"https:\/\/frangipani.se\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/frangipani.se\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/frangipani.se\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/frangipani.se\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1070"}],"version-history":[{"count":0,"href":"https:\/\/frangipani.se\/index.php?rest_route=\/wp\/v2\/pages\/1070\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/frangipani.se\/index.php?rest_route=\/wp\/v2\/pages\/1037"}],"wp:attachment":[{"href":"https:\/\/frangipani.se\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1070"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}
\nAnd we also got to experience that if it rained in the morning there were no construction workers on the whole day on work.\u00a0Thai’s are not a nation of speed.
\nBut we struggled on, windows and doors were in place, things was painted, the bathroom was tiled, water was brought in, the kitchen was in place and last night, Tomas had on Koh Tao we finally got to sleep in our dream home.\u00a0Me, my mom and her friend with her husband moved up to the house a few days later.<\/p>\n
\nBut even though the house was habitable in the end it is still small things left, it will be painted and sanded a bit to the stairs and railings.\u00a0The toilet will be fixed and cupboard to be replaced.\u00a0Garden should be planted so it will be nice and green when we coming up to the house.\u00a0Pots and plants has to be purchased for the terraces.\u00a0Then hopefully in the near future there should be a swimming pool.\u00a0For of course you have to have swimming pool in Thailand.\u00a0We have an incredible pool area plans that we will soon be put into action!<\/p>\n
\nBut as it looks in the current situation, we will never tie or build something with Narong again.\u00a0He has totally consumed our confidence both he and for other Thai’s.\u00a0Next time we build something, we will be extremely careful with everything. Especially whom we pay money for, and certainly do not pay large sums at a time to!<\/p>\n
\nAlthough we believe that there are always things to fix no matter if you have property in Thailand or Sweden.
\nThis is how our house looks like so far.\u00a0Pictures Frangipani Villa<\/a>.<\/p>\n